BOQ/ MATERIAL TAKE-OFF

BOQ/ MATERIAL TAKE-OFF

BIM model generates accurate quantity of all materials. These quantities are automatically updated with any changes in the BIM model. Quantity Take-Off (QTO) reports can be formatted in Excel and exported to a database for detailed analysis. Quantities can be generated for a specific time period or project area (4D/5D) to help manage material procurement and save inventory costs.

The following elements can be generated from a BIM model:

  • Structural elements – Concrete, Steel, Rebar’s, CMU Walls, etc.
  • Architectural elements – Block Work, Ceiling, Doors and Windows, Railings, Finishes, etc.
  • MEP elements – Ducts, Pipes and Fittings, Accessories, Equipments, Cable Trays, Hangers, etc.

Our Office
Top